Getting Started with Rillsoft Project: A Beginner’s GuideRillsoft Project is a project management solution designed to help planners, project managers and teams visualize schedules, allocate resources efficiently, and monitor project progress. This guide walks you through everything a beginner needs to know: core concepts, initial setup, creating projects, scheduling, resource management, tracking progress, and tips to get the most value from Rillsoft Project.
What is Rillsoft Project?
Rillsoft Project is a desktop-based project planning and scheduling application (with some versions offering server-based collaboration components). It focuses on visual planning—Gantt charts, resource views, and capacity planning are central features. The software is particularly useful for organizations that need detailed resource leveling, multi-project management, and a combination of top-down strategic planning with bottom-up operational scheduling.
Before You Start: Key Concepts
- Projects and subprojects: A project is the top-level container for tasks, milestones, and resources. Projects can contain subprojects to reflect hierarchical planning structures.
- Tasks: The building blocks of your schedule. Tasks have durations, start/end dates, dependencies, and assigned resources.
- Milestones: Zero-duration markers for key events or deliverables.
- Resources: People, teams, machines, or anything that can be assigned to tasks. Resources have availability calendars and cost rates.
- Dependencies and constraints: Task links (Finish-to-Start, Start-to-Start, etc.) define the logical order of work. Constraints (e.g., “must start on”) override scheduling rules.
- Baselines and versions: Saved snapshots of your plan used for progress comparison and change control.
- Resource leveling and capacity planning: Techniques to balance workload and avoid overallocations.
Installation and Initial Setup
-
System requirements
- Ensure your PC meets the software’s requirements (Windows OS, sufficient RAM, and disk space). Check the Rillsoft website or your product documentation for specifics on versions and server components if you intend to use multi-user features.
-
Installation steps
- Run the installer package and follow prompts.
- For multi-user or server setups, install the server component and configure network access according to your IT policies.
-
Licensing and activation
- Enter your license key or connect to your organization’s license server. Some versions offer trial licenses—use a trial to evaluate features before purchase.
-
Initial configuration
- Set up company calendars, working hours, holidays, and default task durations.
- Create resource pools or import resources from CSV/Excel if supported.
Creating Your First Project
-
Start a new project
- Use the New Project wizard (if available) or create a blank project file.
- Name the project, set a start date (or finish date if using backward scheduling), and define the overall calendar.
-
Define the Work Breakdown Structure (WBS)
- Break the project into phases, deliverables, and tasks. Use a hierarchical structure for clarity.
- Keep task durations realistic—avoid overly granular or overly broad tasks.
-
Enter tasks and milestones
- Add tasks with short, descriptive names.
- Insert milestones for decision points, deliveries, and review dates.
-
Set task durations and constraints
- Define durations in days, hours, or other units supported by your version.
- Use constraints sparingly—prefer dependencies for flexible scheduling.
-
Link tasks with dependencies
- Apply Finish-to-Start (FS) by default; use Start-to-Start (SS), Finish-to-Finish (FF), or Start-to-Finish (SF) only when needed.
- Add lag or lead times where required (e.g., cure time after pouring concrete).
Resource Management
-
Create resource entries
- Add team members, departments, contractors, or equipment as resources.
- Assign attributes: cost rates, calendar (working hours, vacations), and maximum availability.
-
Assign resources to tasks
- Allocate resources directly on tasks or use the resource assignment view.
- For staffing scenarios, assign the percentage of a resource’s capacity (e.g., 50% allocation).
-
Resolve overallocations
- Use Rillsoft’s resource leveling tool to shift tasks, split work, or assign alternate resources.
- Review the resource histogram or capacity view to spot peaks and valleys.
-
Use skill and role-based allocation
- If available, tag resources by skill or role to filter appropriate assignments and avoid assigning a specialist to a general task.
Scheduling Modes and Strategies
- Forward vs. backward scheduling: Choose forward from a start date for standard planning; use backward scheduling if the deadline is fixed.
- Critical Path Method (CPM): Rillsoft calculates critical tasks—those that determine project duration. Focus on these for on-time delivery.
- What-if planning: Create copies or scenarios of plans to compare different resource allocations, project sequences, or deadline adjustments.
Tracking Progress and Controlling Changes
-
Baselines
- Save a baseline before major execution starts. Baselines preserve planned start/finish dates and effort for later comparison.
-
Updating progress
- Mark tasks as percent complete, record actual start/finish dates, and enter actual work/hours.
- Use timesheet import if your team logs time elsewhere.
-
Variance analysis
- Compare actuals to the baseline to see schedule slippage and effort variances.
- Focus corrective actions on tasks on—or near—the critical path.
-
Change control
- Maintain versioning of project files. Document scope, schedule, and budget changes.
- Re-baseline once agreed changes are approved.
Multi-project and Portfolio Views
- Consolidate multiple projects into a portfolio to view resource conflicts, priorities, and aggregated timelines.
- Use cross-project resource pools to avoid double-booking personnel.
- Prioritize projects and run portfolio-level resource leveling to align capacity with strategic goals.
Reporting and Exporting
- Built-in reports: Generate Gantt charts, resource histograms, progress reports, and cost summaries.
- Export options: Export to PDF for presentations, XLS/CSV for external analysis, or XML for integration with other tools.
- Customize views: Create filters, custom columns, and saved views for stakeholders (executives want summary timelines; team leads need task-level detail).
Tips for Beginners
- Start simple: build a basic WBS and one resource pool before adding complexity.
- Use milestones to create clear checkpoints.
- Keep task names short and action-oriented (e.g., “Draft design spec”).
- Re-baseline only with documented approval.
- Regularly review the resource histogram—early detection of overallocations reduces scrambling.
- Back up project files frequently, especially before major changes.
Common Pitfalls and How to Avoid Them
- Over-detailed tasks: Too many tiny tasks create overhead. Aim for tasks that are meaningful reporting units (often half-day to one-week duration).
- Ignoring constraints: Overuse of fixed-date constraints can prevent realistic scheduling—use them only when truly required.
- Not maintaining resource calendars: If holidays or part-time schedules aren’t modeled, your plan will be inaccurate.
- Skipping baselines: Without baselines, it’s hard to measure performance and justify corrective actions.
Learning Resources
- Official manuals and help files shipped with the product.
- Vendor tutorials and sample projects—use them to see real-life examples of structuring work.
- Community forums and user groups—for tips, templates, and troubleshooting.
Example: Simple Project Walkthrough (high-level)
- Create Project “Website Launch” — Start Date: Sept 1
- WBS: Planning, Design, Development, Testing, Launch
- Add Tasks: “Define requirements” (5d), “Create wireframes” (7d), “Develop frontend” (15d), etc.
- Add Milestones: “Requirements approved”, “Beta ready”, “Go-live”
- Add Resources: PM (100%), Designer (50%), Dev1 (100%), Dev2 (50%), QA (25%)
- Link tasks, assign resources, run resource leveling to remove overallocation on Designer.
- Save baseline, begin execution, update percent complete weekly.
Conclusion
Rillsoft Project offers a robust set of tools for visual scheduling, resource management, and multi-project planning. For beginners, the key is to master the basics—WBS, task dependencies, resource assignments, and baselining—then progressively add complexity like portfolio views and advanced leveling. Start with a small pilot project, iterate on your configuration, and use the software’s reporting to keep stakeholders informed.